Time for the lathe to earn its rent. My 3rd form 1 just came back.
I signed and mailed on Feb. 6th and it was approved Aug 2nd just shy of 7 months.
Let it begin!
Time for the chips to fly, #3 just came back.
- twodollarbill
- Silent But Deadly
- Posts: 420
- Joined: Wed May 30, 2007 5:25 pm
- Location: wisconsin
Re: Time for the chips to fly, #3 just came back.
......and women wonder why we get get so excited
-
- New Member
- Posts: 8
- Joined: Mon Aug 25, 2008 7:53 am
Re: Time for the chips to fly, #3 just came back.
@ rqlasl
I'm wanting to start a from 1 and have not found any info on when an individual build can begin. Is it absolutely and not a minute before the tax stamp is in your hand? Is there any way around doing some advanced prototyping or fabbing maybe a threaded barrel adapter?
I'm wanting to start a from 1 and have not found any info on when an individual build can begin. Is it absolutely and not a minute before the tax stamp is in your hand? Is there any way around doing some advanced prototyping or fabbing maybe a threaded barrel adapter?
Re: Time for the chips to fly, #3 just came back.
You may not begin any fabrication of the suppressor or any parts that go on or in the suppressor until your approved form 1 is stamped and back in your hands.
Then and only then let the chips fly!
Then and only then let the chips fly!
- Bendersquint
- Industry Professional
- Posts: 11357
- Joined: Sat Jan 07, 2006 7:19 pm
- Location: North Carolina
- Contact:
Re: Time for the chips to fly, #3 just came back.
Didn't you read my post that you responded to?featherhead wrote:@ rqlasl
I'm wanting to start a from 1 and have not found any info on when an individual build can begin. Is it absolutely and not a minute before the tax stamp is in your hand? Is there any way around doing some advanced prototyping or fabbing maybe a threaded barrel adapter?
ETA - I see you did, you posted in the main forum after posting this.